Friday, 22 May 2015

11th Malaysia Plan (11MP)

1. Establishment of Malaysia Vision Valley, an integrated development encompassing Nilai, Seremban and Port Dickson.
2. Implementation of KL-Singapore High Speed Railway, Southern Double Tracking, Pan Borneo Highway, MRT 2, LRT 3, Central Spine Road, and various highways.
3. RM28bn allocation to construct 3 coal fired power plants and 2 gas fired power plants capable of generating 7,626MW.
4. Households in Kuala Lumpur and high growth areas to enjoy high speed broadband of 100mbps by 2020 while the rest have access to 20 mbps.
5. RM53bn investment for Pengerang Integrated Petroleum Complex in 2016.
6. Construction of a water treatment plant and integrated sewage network in Kinta Barat, Papan, Perak for RM2bn.
7. Kuala Lumpur, Johor Bahru, Kuching and Kota Kinabalu are identified as four key cities to propel economic growth and enhance the nation’s competitiveness.
8. Bumiputera contributors can withdraw their savings from EPF Account 1, subjected to minimum savings rule, to invest in Amanah Saham Bumiputera 2 that will be launched soon.
9. Construction of 653,000 affordable homes vs. 74,000 in 10MP.
10. Renovation allocation of RM5,000 to RM10,000 per home in rural areas involving 400,000 homes or RM2bn-RM4bn in total.

No comments:

Post a Comment